The Smart Marty Sky Dispatch

Worldwide AviationSmartMarty.ca
Worldwide Aviation

TAV Airports completes €29 million modernisation of Almaty Airport domestic terminal in 13 months

TAV Airports has completed a €29 million modernisation of the domestic terminal at Almaty Airport, expanding passenger processing, security screening and baggage handling capacity.

TAV Airports completes €29 million modernisation of Almaty Airport domestic terminal in 13 months
Featured aviation image for this report.

TAV Airports has completed a €29 million upgrade of the domestic terminal at Almaty Airport, with the project aimed at expanding passenger processing capacity, security screening, and baggage handling within the terminal complex. The completion was announced by International Airport Review on 2026-11-16, indicating that the modernization was carried out inside the Almaty Airport facility and targeted the domestic terminal operations specifically.

According to the reporting, the upgrade focused on increasing throughput for domestic passengers, improving security screening procedures, and enhancing baggage handling capabilities to support smoother and more efficient flows through the terminal. The scope of work is described as an in-facility modernization, meaning the improvements were executed within the existing domestic terminal footprint rather than as a new building or separate structure.

The International Airport Review piece notes that the €29 million investment was dedicated to upgrading the domestic terminal’s capacity and processing capabilities, aligning with broader efforts to enhance Almaty Airport’s functionality for domestic travelers. The article does not detail the exact changes to baggage handling technology, security screening equipment, or the specific architectural or passenger flow changes, but it confirms the three focal areas: passenger processing, security screening, and baggage handling.

The Art Newspaper contribution to the same event contexts the overall narrative of modernization by situating the Almaty upgrade within the broader ecosystem of aviation-related developments that sometimes intersect with cultural venues or events. However, The Art Newspaper’s content provided here centers on a different aviation-related topic (the Nomad art and design fair in Abu Dhabi) and does not add new specifics about the Almaty Airport project beyond acknowledging the event’s reporting lineage.

FOX Carolina News touches on aviation disruption topics in its broader coverage, but in relation to this event, the outlet’s material presented here discusses a nationwide U.S. air travel ground stop and related authority actions, rather than details about the Almaty Airport modernization. Consequently, there is no additional factual detail about the Almaty project drawn from FOX Carolina News beyond noting the existence of coverage on aviation incidents elsewhere.

Prothom Alo English provides coverage about aviation in a different national context, namely Bangladesh, and discusses plans to partially open Hazrat Shahjalal International Airport’s third terminal in Dhaka on 16 December, including operational preparations and ministerial statements. This information is unrelated to Almaty Airport and should not be conflated with the Almaty modernization report; no direct details about the Almaty project are drawn from this source.

Read the original source

Share this aviation story

Back to aviation news